An Area Edition is commissioned before a property is chosen. It describes the conditions of living in two zones, drawn from the public record and from direct enquiry to the bodies that supply each service, so that the choice of neighborhood is made on facts rather than on what a listing says about a view.
No property was identified and no title, corporate, tax or permit record was examined. Nothing in this report describes any specific lot, house or listing, and nothing here should be read as a finding about one.
This is not a legal opinion, not a valuation, and not a recommendation that either zone is the better choice. Conditions change, and a finding accurate on the date it was checked may not describe the position today.
Zones were defined by cantonal and district boundary rather than by the names used in listings. "Lindora" and "Río Oro" are commercial names, not administrative districts, and a listing using one may sit in a different district from the one a buyer assumes.
Zone A. Where the canton sits and what it adjoins, the corridor it is reached by, and the physical character of each district examined: the mix of gated developments and standalone houses, how built-up each sector is against the outlying parts of the same canton, and the commercial, medical and institutional anchors within a short drive. Private hospital campuses, business parks, schools, markets and the day a weekly feria runs are facts of the place, and are given with the operator named and, where recent, the date each opened or came into service.
Zone B. The same account for the second canton, written to be read beside the first rather than as a separate report. Where the two differ in a way that would matter to the decision, elevation and climate, density, the character of the housing stock, the distance to private healthcare, that difference is stated plainly and neither zone is described as the better one.
Neither zone is one place. The districts and sectors within each canton read differently from one another, and they are described separately rather than averaged. A buyer told only the name of a canton has been told very little.
Anything live in either zone on the date this report was issued: roadworks and their stated duration, a water or sewer project underway, a zoning or Plan Regulador process in consultation, a municipal works programme, or a development in permitting that would change the immediate surroundings.
Where there is nothing unusual to report in a zone, this part says so in those words. It is restated for every engagement rather than left standing from a previous one, because a line that is never refreshed stops meaning anything.
Zone A. Supplied by AyA on the national network across the districts examined. Availability letters (carta de disponibilidad de agua) are issued by AyA directly, and the status of the supply at a given address is confirmable before purchase.
Zone B. Supply is split. Part of the canton is served by AyA and part by ASADAs, which are community-run water associations operating under their own statutes. Where an ASADA supplies a lot, a new connection requires the ASADA's own availability letter, and some ASADAs operate waiting lists for new connections.
Dry-season pressure reductions were reported by both bodies for parts of each zone. The affected sectors and the months stated were recorded and supplied with this report.
Route classification for every road serving each zone, stating which are national routes maintained by MOPT and which are cantonal roads maintained by the municipality. The distinction decides who is responsible for repair and how quickly it tends to happen.
Surface condition on the access roads was observed directly and is described plainly: paved, in repair, unpaved, or seasonal. Where a route is the only access to a sector, that is stated, because a single point of access is a different proposition from two.
Travel times to Juan Santamaría airport, to the nearest hospital, and into San José were measured on two weekday mornings in each zone and are reported with the times and dates they were measured, not as averages.
The supplying electricity utility for each zone is named, since the distributor differs by canton and so do connection procedures and tariffs.
Fixed internet availability is reported by technology actually available at the street, fibre, cable or fixed wireless, rather than by the operator's marketing coverage map. Where a sector is served only by fixed wireless or satellite, that is stated.
Distance to the nearest public clinic (EBAIS), private hospital, pharmacy, supermarket and school is given for each zone, measured from the district centre.
Whether each canton has a Plan Regulador in force, what it permits in the sectors examined, and what the setback, height and coverage rules are where one applies.
Where a canton has no Plan Regulador in force, that is stated, together with the national rules (INVU) that apply in its absence.
Flood, landslide and seismic fault mapping published for each zone, with the sectors identified by the publishing body and the date of the mapping relied on.
Aquifer protection and recharge-area designations, where they apply, since these restrict what can be built and what drainage is permitted irrespective of the Plan Regulador.
Whether an environmental viability study (SETENA) is required for ordinary residential construction in each zone, and at what scale of project that requirement begins.
Garbage collection, street lighting and any other municipal service charges applied in each zone, listed per canton as published, with the date of the published schedule relied on. These are the recurring charges that differ between the cantons examined.
The declared-value cycle each municipality runs, which sets when an owner in that canton is next required to update the declaration. The cycle differs by municipality even though the obligation does not.
Items that came up during the work which no public record answers are recorded here as questions rather than left out. In this sample they include the current new-connection position of a community water association, which is set by its own board and is not published, and the condition of a cantonal road in the months after the rainy season, which is observable but not recorded anywhere.
Naming these is part of the work. A report that lists only what it could confirm leaves the reader to assume the rest was checked.
Findings are stated without characterising how serious they are and without a recommendation about what to do. Where nothing is recorded, this section says so rather than being left blank.
| Source | What was requested | Date | Result |
|---|---|---|---|
| AyA, Instituto Costarricense de Acueductos | Supply status and availability position | 06 Oct 2026 | Returned |
| ASADA serving Zone B | New-connection position | 06 Oct 2026 | Returned, verbal |
| MOPT route classification | National vs cantonal road status | 07 Oct 2026 | Returned |
| Municipal road inventory, both cantons | Maintenance responsibility | 07 Oct 2026 | Returned |
| Electricity distributor, each canton | Supplying utility and connection procedure | 07 Oct 2026 | Returned |
| Plan Regulador, each canton | Zoning in force | 08 Oct 2026 | Returned, one canton partial |
| CNE hazard mapping | Flood and landslide designations | 08 Oct 2026 | Returned |
| SENARA | Aquifer vulnerability designations | 08 Oct 2026 | Returned |
| Municipal tax schedules, both cantons | Rates and service charges published | 08 Oct 2026 | Returned |
| Direct observation, both zones | Road condition and travel times | 07 Oct 2026 | Completed |
A source that returned nothing, or that was not accessible, is listed anyway. What was not available is part of what this report tells you.
This is a redacted sample, published so that anyone can see the format and the standard of evidence before commissioning anything. It is not an issued report, it describes no real engagement, and the figures in it are illustrative.
An issued report carries a report ID in the TR-YYYY-NNNN form and is published by THE REPORT at a permanent address. Anyone holding a copy may confirm it at jotapropertiescr.com/verify using that ID, without permission from whoever supplied it. Where a copy differs from the published version, the published version governs.
Prepared independently. No commission is taken on any transaction, and THE REPORT has no stake in whether a property sells. Use of any report is governed by our Terms of Service. To commission one, start here.